Bookcover of Implementation of Line of Balance in bridge project
Booktitle:

Implementation of Line of Balance in bridge project

LAP LAMBERT Academic Publishing (2018-10-19 )

Books loader

Omni badge eligible for voucher
ISBN-13:

978-3-659-80742-8

ISBN-10:
3659807427
EAN:
9783659807428
Book language:
English
Blurb/Shorttext:
Line of Balance (LOB) is a management control process for collecting, measuring and presenting facts relating to time all measured against a specific plan. It shows the process, status, background, timing and phasing of the project activities, thus providing management with measuring tools that help to Comparing actual progress with a formal objective plan and examining only the deviations from established plans, and gauging their degree of severity with respect to the remainder of the project. The LOB itself is a graphic device that enables a manager to see at a single glance which activities of an operation are “in balance” – i.e., whether those which should have been completed at the time of the review actually are completed and whether any activities scheduled for future completion are lagging behind schedule. CPM is continuously used in India for network analysis and finding critical path, Problem is taken as challenge to introduce and the new technique named linear scheduling which is proved better than CPM for repetitive construction works.
Publishing house:
LAP LAMBERT Academic Publishing
Website:
https://www.lap-publishing.com/
By (author) :
Amit Sharma, Vikas Sharma
Number of pages:
60
Published at:
2018-10-19
Stock:
Available
Category:
Technology
Price:
39.90 €
Keywords:
Bridge, Microsoft Project, Scheduling, Activity, Line of Balance(LOB), Critical Path Method(CPM)

Books loader

Newsletter

Adyen::amex Adyen::mc Adyen::visa Adyen::cup Adyen::unionpay Paypal Wire Transfer

  0 products in the shopping cart
Edit cart
Loading frontend
LOADING