Capa do livro de Reducing Time Delay by Using Agile Construction Management Principles
Título do livro:

Reducing Time Delay by Using Agile Construction Management Principles

Iraq Case Study

LAP LAMBERT Academic Publishing (2019-07-26 )

Books loader

Omni badge Apto para vale
ISBN- 1 3:

978-620-0-10172-3

ISBN- 1 0:
6200101728
EAN:
9786200101723
Idioma do livro:
Inglês
Anotações e citações/ texto breve:
The failure to balance the goals of the construction process is one of the main problems faced by the projects, nearly two-thirds of the construction projects in the world have been suffered from significant problems as cost overrun of a project, delay in the specified duration of a project, and stopping the project. The delay in completing any phase of the project or completion of the entire project is considered as the most important problems. This book aims to build a system for reducing delay during the life cycle of construction projects in Iraq based on the principles of Agile construction management (ACM). For achieving this goal, the related literature has been reviewed, and a case study along with a questionnaire survey has been done to study and analyze the delay problem in Iraqi construction projects. Then a closed questionnaire and personal interviews with experts were conducted to examine the values and principles of ACM that applicable in Iraqi construction projects and to identify the values and principles that related to reduce the delay and to propose appropriate procedures to address delay problem.
Editora:
LAP LAMBERT Academic Publishing
Website:
https://www.lap-publishing.com/
Por (autor):
Asmaa J. J. Isaa, Sawsan R. M. AL-Zwbaedy
Número de páginas:
228
Publicado em:
2019-07-26
Stock:
Disponível
Categoria:
Tecnologia
Preço:
76.9 €
Palavras chave:
Agile, Construction, time, delay, Projects

Books loader

Boletim informativo

Adyen::amex Adyen::mc Adyen::visa Adyen::cup Adyen::unionpay PayPal Transferência Bancária

  0 produtos no carrinho
Editar carrinho
Loading frontend
LOADING